Fixed-price estimates. The price doesn't change unless the work changes. Call 281-326-9719
Guide

Fixed price vs change orders: how to read a contractor estimate

Why the lowest number often costs the most, and what to look for.

By Sam, founderPrices from our own projects
Short answerA fixed-price estimate lists the full scope and materials with 1 price that only changes if you change the work. A low estimate full of allowances and vague lines is often raised later through change orders. Compare estimates line by line, not by the total.

How the lowball estimate works

An estimate with low allowances (for tile, fixtures, cabinets) and vague scope looks cheap. Once work starts, the real choices cost more than the allowances, and anything not written down becomes a change order. The final bill ends up higher than an honest estimate would have been.

What to look for in any estimate

  • Every room and task listed, not "remodel bathroom"
  • Materials named, or allowances that are realistic
  • Who pulls permits and pays the fees
  • What happens with hidden conditions, in writing
  • A payment schedule tied to work done
  • The warranty in writing

Our promise

Your price doesn't change unless you change the work. Read our process.

Questions

Are allowances bad?

Not always. Realistic allowances are fine. Very low allowances are a warning sign.

Should I always take the lowest bid?

Compare what each estimate includes. The lowest total is often the least complete.

Free estimate

Tell us about your project

Sam or the team will call you back within 1 business day to talk it through and book a site visit.

281-326-9719

[email protected]

Request your free estimate

About 2 minutes. Pick a time in our calendar at the end.

$1,000 off your project when you book through our estimate page.*

*Valid on signed contracts of $15,000 or more. 1 per household. Cannot be combined with other offers. Book by December 31, 2026.

☎ CallFree Estimate